Project owner: SOGEA SATOM
Location: Sénégal
Stufy: 2018-2019
Construction: 2018-2020
The project includes the laying of a third transmission line called ALG 3 after ALG 1 (for the Ngnith plant) and ALG 2 (for the Keur Momar Sarr plant). The first section of this transmission line will be laid between the plant and Thiès. The second will be laid between Thiès and Dakar. The total distance is 216 kilometres.
SC Afrique participated in this project, jointly financed by the AFD (French Development Agency), the EIB (European Investment Bank), the IsDB (Islamic Development Bank), the World Bank, the ADB (African Development Bank) and the Government of Senegal through SONES for a total amount of 87.2 billion CFA francs with the company SOGEA SATOM in charge of LOTS 3 and 4.
Our missions
Membre du groupe
Member of the group
小组成员
Ouakam Dakar, Peytavin
BP 11268 Dakar
Senegal
.+221 338 601 530
.contact@scafrique.com